Brian Sieger
Senior Facilities Director
Pueblo, CO
siegerbs@gmail.com
608.445.1706
Multi-Site Management • Construction Oversight • Large-Scale Project Execution • Staff Development
Senior Facilities Director with extensive experience in facilities maintenance management. Specialize in preventative maintenance programs, access control operations, construction specifications, space planning, analytics, budget oversight, and global property management. Track record of managing wide range of facilities operations and maintenance programs to support long-term strategic goals and drive company profitability. Manage multi-million-dollar projects for international organizations. Supervise, develop, and coach high-performing teams. Excellent leadership, organizational, critical thinking, and problem-solving skills.
An exceptionally talented and responsive maintenance and construction professional offering a solid wealth of career achievements and a proven history of not only the highest integrity and most safely accomplished assignments, but consistently executing them in a manner that is both timely and under budgetary expectations.
ACHIEVEMENTS
Process Visualization & Improvement
- Led development of new multi-site build-out process from conception through completion, saving approximately $20,000 in savings per move. Read Full Story
- 15% increase in work order completion gained after implementing high-impact process improvements and cross-training team members to eliminate siloed knowledge.
- Created cross-departmental matrix and process for setup and tear down of five million-square-foot event center still used today.
- Implemented process for shipping security items to overseas sites to achieve complete visibility from one location and software, saving approximately $7,000 in technician airfare and travel time per security installation.
- Established safety checks and analysis processes, allowing departments to identify areas of improvement.
Project Planning & Optimization
- Saved $1 million in revenue by ensuring departments remained operational after rental office building was directly hit by damaging tornado. Read Full Story
- Saved hospital over $30,000 through installation of new emergency generator with no loss of power.
- Completed six major projects on time and under budget through effective communications with all stakeholders and affected departments.
- Achieved return to redundancy for majority of equipment with zero hospital downtime.
Cross-Functional Collaboration & Communication
- Decreased cross-departmental conflict and reduced staff turnover due to hostile work environment to 0% within three months by eliminating barriers between departments and resolving grievances. Read Full Story
- $210,000 in savings earned per year by recruiting thousands of company volunteers to assist with annual event versus hiring outside contractors.
- Monitored Y2K computer glitch through establishment of command center to communicate and follow up with 12 global customers.
Organization Development & Change Management
- 100% of generator inspections passed through standardization of generator reporting tools. Read Full Story
- Reduced overtime calls 75% by replacing multiple problematic water lines and changing department’s thought process to can-do attitude.
- 68% reduction in mechanic travel time and 34% decrease in equipment failures achieved over six months through development of multi-site preventative maintenance program.
Team Building, Mentorship, & Manager Development
- Developed productive staff by creating achievements and inspiring desire to achieve professional growth. Read Full Story
- Improved patient satisfaction by 30% within two months by ensuring staff were properly trained to perform in-house renovation work to improve patient room efficiencies.
- Built respected and efficient team over five months through establishment of daily goal setting and performance expectations while driving accountability.
Complex Capital Project Management
- Coordinated eight-hour water shutdown with zero issues through project risk mitigation and preparation. Read Full Story
- $20 million in annual construction savings realized by reducing build-out timing from 24 to 15 months.
WORK HISTORY
EDUCATION & PROFESSIONAL DEVELOPMENT
Scheduled to Complete December 2022
New Hampshire University/Capella University
Technical Diploma, Madison Area Technical College
Certifications – Mechanical Refrigeration Recovery, Electrical/Small Electronics, OSHA 30 Hour, Refrigerant Recovery, Bobcat, Scissor Lift, Single Man Lift
Training – Flooring, Carpet and Tile Installation, HVAC, Electrical and Plumbing, Painting and Drywall Level 4
Member – American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), American Society for Health Care Engineering (ASHE), National Fire Protection Association (NFPA), National Society of Leadership and Success